Slip on caps are 100 stainless steel.
Post to membrane roof connector.
Adjustable sleeve can be any desired height.
Attaches to the surface of existing roof structures quick easy installation reduces cost requiring minimal labor and eliminating the need for roof penetration and repair.
Fusion roof anchor post can accommodate most industrial roof designs including standing seam membrane built up metal sheathing concrete and wood.
The screws or lags should be as long as possible without protruding from the bottom of the sleepers and putting holes in the roof membrane.
Built up roof membrane 1 cdx plywood corrugated metal and concrete roof decks 1 concrete 2.
Hello everyone looking for some advice on our clients second story deck above a sunroom with flat roof above.
Client had the deck replaced approx.
It is essential to place 2x12 blocking on the flat between the sleepers at post locations so the lags will have something solid to bite into.
Single ply membrane roofing has become one of the top roofing materials for most commercial facilities.
With the bright white reflective attributes of tpo there is money to be saved on energy usage during the warmest months of the year.
10 years ago copper flashing torched membrane with two staircases.
Currently the support posts for the railing system are going down thru a flat rubber roof and are attached to the ceiling framing of the sunroom below.
It s the simplest and lowest cost way of applying a heat welded single ply system that can practically be installed year round with warranties of up to 30 years.
Client has a tiled outside deck over a living area it doesn t leak.
Roof deck railing post flashing my problem is a little different.
D bolt forged anchorage connector 420 lb weight capacity attaches to concrete wood.
Roof anchor 1 roof post 1 truss boss anchor 1 view all.
Post is 2 5 round high strength steel.
Gutters of timber plywood or reinforced concrete may be faced inside with thermal insu lation boards selected and fixed according to the local standards in force.
Round post with slip on caps.
There are savings to be had in its cost effectiveness for businesses almost anywhere.
A typical 100 square roof with two layers of polyiso insulation can be mechanically attached and the roof fully closed up in five days with an optimum crew.